Ppg clear coat dry time. Here's the details: .
Ppg clear coat dry time Color: BAC 900 Clear Gloss: 90+ G. CONCEPT® DCU2021 Urethane Clear P‐199 DCU2021 CONCEPT® DCU2021 Urethane Clear is easy to apply and produces a high gloss 2 wet coats Total Recommended Dry Film: Tape Time: 5‐6 hours 6 hours 6 hours 10 hours Air Dry: 16 hours at 70°F (21°C) Force This can be accomplished with two medium coats with a 50% overlap. Ideal for spot or whole car refinish. 0 mils Flash Time: Between coats: 5 – 10 minutes @70°F (21°C) before force drying Dry Times: To Touch: 30 - Dry Film Thickness: 1. DRY TIME: 24-48 hours, depending on temperature and humidity VOC: Does not exceed 550 g/L (4. Total Dry Film Build Minimum Maximum 50 m 60 m Theoretical Coverage* 7 – 7. 2042 is a tad faster clear meaning it dries faster, but 2055 has that LOOK to it if you know what I mean, its the best PPG clear Ive sprayed hands down!!! Anoher clear choice would be Desothane® HD 9008B0900D Buffable Clear Coat medium wet vertical coat) to a dry film thickness of 25-30 microns (1 to 1. The third coat of clear covers the sanded area right up to the sand line. 5 mils Flash Off at 70°F (21°C): Flash: 3 - 5 minutes between coats Drying Times: Dust-free: 70°F (21°C) 80 - 100 minutes Air Dry to Re-assemble: 70°F (21°C) 4 hours minimum Force Dry: 140°F (60°C) 25 minutes Tape Time: Coats: 2 - 3 full wet coats For optimum performance, final recommended film build is 2. The Base coat / clear coat system provides extended service life, improved buffability, and a smooth, easy to clean surface. Coats: 2 - 3 coats or until proper color is achieved Dry Times Between Coats: 5 - 10 minutes at 70°F (21°C) Air Dry: Tape: 45 minutes Clear Coat: 20 minutes minimum, 24 hours maximum at 70°F (21°C) Clean Up Clean spray guns, gun cups, storage pots, etc. i wonder if a clear top-coat of valspar (zenith) I buy all Base applied over light grey sealer, covered in 3 coats. The clear looks like crap. Polishing: Use a 3 step process. Recommended dry film thickness 20 - 25 µm (0. Remove all corrosion, rust, well if your going to clear coat a base that has been sitting for days or weeks what you dont want to do is use fast activator in a hot temp or spray your clear on the dry side. Old bare weathered wood: Weathered wood previously finished with FLOOD CWF-UV Desothane® HD 9008 is a pigmented base coat designed for use with clear coat 9008B0900D. Slower reducers will allow the clearcoat to flow for a longer time. This is the 2nd thread we've had in the past few days about clear coat not hardening. 5 m²/L * Theoretical coverage in m2/L ready-to-spray, giving 50 m dry film thickness. You must clear coat it with an activated clear. Force Dry: 30 minutes at 140°F (60°C) 30 minutes at 140°F (60°C) IR: 12 - 15 minutes 12 - 15 minutes Polish: Air Dry 2 - 4 hours at 70°F (21°C) 6 - 8 hours at 70°F (21°C) Force Dry After cool down After cool down Recoat: Air Dry: 8 hours or overnight at 70°F (21°C) Force Dry: After force cure and cool down Between Coats: 10 - 15 minutes Dry Time to Clearcoat: 2 coats: 20 minutes 70°F (21°C) 3 coats: 30 minutes 70°F (21°C) 4 coats: 40 minutes 70°F (21°C) 24 hrs. Repair after force dry and cooling cycle or 4 – 6 hours air dry 70°F / 21°C. DRYING TIME: Dry time @ 77ºF (25ºC); 50% relative humidity. RECOMMENDED SUBSTRATE CONDITIONS AND TEMPERATURES PSX® 700 A CLEAR COAT Ref. If the first coat has not tacked up, sagging of the second coat may occur. Surfaces must be thoroughly clean, dry and free of dirt, grease, grime, mildew and previous coatings. The rest of this article will discuss why Through leadership in innovation, sustainability and color, PPG helps customers in industrial, transportation, consumer products, These conditions can result in a finish that may eventually dry, but will exhibit reduced durability, gloss, and make sure it has been given time to warm in the booth to raise the metal temp above 60 2 hours air dry 70°F / 21°C. Those pesky bubbles are everywhere. Products within the Omni ® line are compatible and can be mixed and matched according to operational and cost considerations, creating a tailored solution for collision repair centers. Easy maintenance, clean-dry-recoat For future maintenance, instead of blasting old coatings and repainting as with traditional 20 square meters/liter at 25 microns dry film (801 square feet/gallon at 1 mil dry film) Recommended dry film thickness; 25 to 75 microns (1 to 3 mils) Dry Film Density: 1. If all they gave you was the base you do not have enough to complete the job. Note: All force dry times are quoted for metal temperature. 5 mils. Force Dry: 15 minutes at 140°F (60°C) 20 minutes at 140°F (60°C) IR: 12 - 15 minutes 12 - 15 minutes Polish: Air Dry 2-4 hours at 70°F (21°C) 6 - 8 hours at 70°F (21°C) Force Dry 90 minutes after cool down 90 minutes after cool down Recoat: Air Dry: 8 Deltron NXT DCU2042 Low VOC Speed Clear P-216 Polishing: Air Dry: 12 hours at 70°F (21°C) minimum Force Dry: After cool down Recoat and Repair: Recoat Recoat after 2 hours after force dry and cool down or 8 hours air dry at 70°F (21°C) After 3 days DCU2042 must be sanded before recoating with primer, color or clear. They mix candy concentrates or dyes with the urethane clear. Grade Wet: European P800-P1200 / US 500-600 Grade Dry: European P600-P800 / US 400-500 Recoating times will be extended at lower temperatures. , thoroughly with MR Reducer, MS251 Multi Purpose Solvent or Yes, I am saying I can still see the 400 grit sand scratches in the build primer. To Touch: 15 to 20 minutes To Handle: 1 hour To Recoat: After 2 hours For Foot Traffic: 12 hours My PPG DC3000 will not dry/won't harden. Additional time must be allowed during force dry to allow metal to reach recommended Number of Coats 2 coats: 1 full coat + 1 full coat Dry Film Thickness: 40 – 60 µm Flash-Off between coats: 10-15 minutes Flash-Off before bake: 10-15 minutes Drying Time: Air dry at 20°C Dust Free: 45 minutes Handleable: 4 hours Into-Service: 16 hours PPG Industries (UK) Ltd Needham Road Stowmarket Suffolk IP14 2AD Tel: 01449 771771 Recommended film build per coat dry: 1. I let my clear dry completely to touch, no longer any sticky to feel and then a few more minutes. Dry time was approx. 8 mils). 7549 Page 5/5. To Touch: 15 to 20 minutes To Handle: 1 hour To Recoat: After 2 hours For Foot Traffic: 12 hours Yes, I am saying I can still see the 400 grit sand scratches in the build primer. Plus, PPG PSX 700 saves project downtime by curing and drying to the touch in two hours at 20°C (68°F). 5 mils Flash Off at 70°F (21°C): Flash: 10-15 minutes between coats Drying Times: Air Dry to Re-assemble: Overnight 70°F (21°C) Purge Time: 10 - 15 minutes 70°F (21°C) Maximum dry film build: 3. 5 mils Recommended film build per coat dry: 1. To Touch: 30 minutes Tack-Free: 60 minutes To Recoat: 2 hours Coats: 2 - 3 coats or until proper color is achieved Dry Times Between Coats: 5 - 10 minutes at 70°F (21°C) Air Dry: Tape: 45 minutes Clear Coat: 20 minutes minimum, 24 hours maximum at 70°F (21°C) Clean Up Clean spray guns, gun cups, storage pots, etc. Choosing the right clear coat can be a game-changer, giving your car that glossy finish H79 UHS Rapid Clear Coat H79 is a premium ultra high solid 2k acrylic clear coat offering unmatched speed with a premier shine. Drying Times: Between Coats: 5-10 minutes at 68°F (20°C) Dust Free: 20-40 minutes at 68°F (20°C) Dry to Handle 3-4 hours at 68°F (20°C) Tape Time: 6-8 hours at 68°F (20°C) Lower application time & downtime Applying one less coat with PPG PSX 700 saves project labor time and costs. 66 pounds/gallon) Dry Film Weight: 29 grams/square meter at 25 microns dry film (0. haven't tried it yet. To Touch: 15 to 20 minutes To Handle: 1 hour To Recoat: After 2 hours For Foot Traffic: 12 hours Total dry film build per coat: 1. H. 3 %Çì ¢ 5 0 obj > stream xœÅ½ ¨oYu'ø}÷½û¬+¥V©õ4jnŒi߭λuöùµÏ1ÆN´Ú‰¡hŒ]8aÚ cªÓŽt*‰©‘$È B ‚L i‚„p!"I M#’ C#&]4ƒ4¡iDÚ M &„¡‘éÆ?‚ aö÷œïwŸ³÷û¬wïÞkíu į÷}¿ësöZŸ½Ï^Ÿµ üÒYuaê³jÿ Ç ?ûówž~Ÿ=ûg¿|gúóÙÇþÙ _º3\4ûÿL X þÙŸ?{çsîûÃÙx1ögÏýÜ 3ýÝœ5ÃÅ0œÙ¾ÛÛ}îçïÜ»qþÜGÝ7Mu6 I finally did read the PPG tech sheets and they say clear within 24 hours. Drying Times: Between Coats: 5-10 minutes at 68°F (20°C) Dust Free: 60-90 minutes at 68°F (20°C) Dry to Handle 4-5 hours at 68°F (20°C) Tape Time: Over night at 68°F (20°C) • Premium force dry clear Application: Apply: 2 wet coats Total Recommended Dry Film: 2. It may take longer for the clear to dry enough to sand or buff. • Dry film build per coat should be D800 is an easy-to-use, general purpose, high performance two-pack acrylic clearcoat D8175 requires only 5 minutes at 60˚C or 20 minutes at 40˚C. I may need to wait longer between coats. 5 mils Recommended dry film build per coat: 1. Thinners Dry to Tape Wet Edge Time Between Coats Dry to Fly CA8200 All Other Colors 2 ½ - 3 hours 10 minutes 10 - 15 minutes 10 hours CA8200 White and Gray 3 - 4 hours 15 minutes 15 - 20 minutes 12 hours 30 °C (87 °F) Thinners Dry to Tape Wet Edge Time Between Coats Dry to Thanks guys. 7 Coverage figures do not include loss due to surface irregularities and porosity or material loss due to application method or mixing. We’ve put together a list of the top PPG clear coats to make your show car shine like a star. Another way to ensure the best possible clearcoat finish is to use the right temperature reducer for your painting conditions. Add Photo DC2000 is designed for use on repairs of 1-3 panels. U at 60° Dry Time: The dry time is 1 ½ hours at 25°C (77°F) Note: The cure rate of CA8000/B900B edge seal is not affected by humidity. 5 %âãÏÓ 25 0 obj > endobj 52 0 obj >/Filter/FlateDecode/ID[09151FF030A0EE2130279A239DF4EC6A>99BA710FE319AB45BB2458A1A226503C>]/Index[25 44]/Info 24 0 R Number of Coats: 2 coats with 10 minutes flash between coats Film Build: Wet Film Dry Film (per coat) (total) Minimum 2. 0 mils Note: Spray the first coat like you want the last coat to look. Shelf life Base: at least 36 months when stored cool and dry Hardener: at least 24 months when stored cool and dry Notes: - See ADDITIONAL DATA – Spreading rate and film thickness - See ADDITIONAL DATA – Overcoating intervals - See ADDITIONAL DATA – Curing time PRODUCT DATA SHEET March 05 2025 (Revision of April 17 2018) PPG SIGMADUR Allow wood to dry at least 48 hours in dry weather or until it has reached a moisture content of 15% or less before finishing. It'll get 2 or 3 coats of PPG's DCd35 Clear To maximise savings on energy costs while minimising CO 2 emissions, PPG says to use ‘air-dry’ mode, allowing the clear coat to be dust free in 20 minutes at 20 degrees Celsius and ready to fit up in 60 minutes. 16 grams/cubic centimeter (9. 2. MP281 is a fast dry, single-component acrylic primer surfacer that is easy to sand and designed to provide fast build with a minimum amount of coats. If you miss the 24 hour window for getting your clear coat sprayed out, you'll need to scuff the base to specs, spray another coat of base and then clear within the 24 hour window. but yes long turn around time. Mixing DC3000 as a Cut-in Clear Apply: 2 wet coats Total Recommended Dry Film:Total Recommended Dry Film: 2. New or bare wood: • 2 coats: FLOOD CWF-UV. Some painters use urethane clear for their candy coats. Then I would wait until the next day or late tomorrow evening. I sanded everything to 400 grit and sealed with one medium coat of the sealer. 5 mils Recommended film build per coat wet: 2. Shooting clear coat changes all that. See drying time table for inter-coat times. ): To Touch: 30 minutes To Handle: 2 hours A PPG Brand PLEX-SEAL Clear Sealer Freight Classification: PAINT Packaging: 4 Gallons per carton; 5-Gallon Pail Clear Coat Over Metal: Clean surfaces as outlined above. National Rule Compliant Providing excellent versatility in addition to performance and value, Omni ® products offer different properties and qualities to meet refinish requirements. 0-2. drop your pressures a little and get in closer so the paint doesn't have time to dry before it gets to PPG proudly announces the launch of its new premium clearcoat, the D8177 Rapid Performance Clearcoat, which uses advanced technology to achieve a superb, glossy, mirror-like finish with just one application. 2 mils) Apply a second cross coat to achieve total dry film thickness of 50-70 (2. For Should I go smaller for the clear coat? For the clear, it says 20 minutes We found it best to apply the first coat of clear on the drier side and waiting about Total dry film build per coat: 1. Should the clear be dry enough to tack before applying the next coat? I had bad issues with runs and horrible orange peal the first time. , thoroughly with MS251 Multi Purpose solvent or another Number of Coats. ProLuxe ® Interior Clear Wood Finish Lacquer is the brand to trust for an outstanding, fast drying, and easy-to-use finish for any interior wood project. Through dry at 60°C 30 minutes with D8237 / D8238 and 40 minutes with D8239. 6 mils Dry Microns: 41 microns Coverage figures do not include loss due to surface irregularities and porosity or material loss due to application method or mixing. I should add I had better luck when I over reduced 10% I'm pretty much committed to color sanding the clear. PPG Deltron is urethane, PPG does make a single stage but the name escapes me at the moment. Has anyone experimented using BM "stays clear" poly as a top coat over PPG Breakthrough? Last time I used scuff-x on walls (early spring) the dry time was slow. I am getting ready to spray the final colour coats (PPG Duracryl Lacquer) and then proceed with clear coats (PPG DCA 468 Lacquer). 6 lbs/gal); low VOC: does not exceed 350 g/L (2. Theoretical Coverage: (ready for use) 9 m²/Lt @ 50 µm dry film thickness Dry Film Thickness: 0. 5 mils Dry Microns: 12. 7549 Page 1/5. Today’s professionals and enthusiasts alike continue to appreciate its “forgiving nature” and resistance to brush marks, as well as, its crystal clear finish and fast drying time. Coats: 2 - 3 medium wet coats For optimum performance, final recommended film build is 2. I do tack and fix runs between base coats. I'm told you can clear coat over the Advance the next day. 1K primer surfacer can be used over properly prepared painted surfaces and properly treated and primed steel, aluminum, and fiberglass. 4 mils Maximum dry film build: 3. If the first coat is dry to touch, a For instance, PPG's DBC/DBI product specifies a time between coats of 5-10 minutes and a "Dry Time to Clearcoat" of 15 minuts at 70F with a maximum of 24 hours. 0 mils. After 3 days, DC3000 must be sanded before recoating with primer, color or clear. VOC: Mixed, ready for use VOC (EPA method 24) Base Component Activator Component 350 grams/liter 497 grams/liter 113 grams/liter Coats: 2 - 3 medium wet coats For optimum performance, final recommended film build is 2. productivity in air-dry collision repair facilities. 5 mils Dry Microns: 38 microns Coverage figures do not include loss due to surface irregularities and porosity or material loss due to application method or mixing. Plan to put base coat and clear tomorrow, unless I put one more coat of sealer in the am. but it's a hard product. P240 dry for Primer Filler P400 dry for Envirobase Basecoat P800-P1000 for Re-Clear/Flow-Coat - Force dry 40°C, 60°C or IR After cooling - Air dry at 20°C Minimum 1 hour OVERCOAT WITH Any PPG 2K Primer, or Envirobase HP Basecoat POLISHING recommended that it is carried out between 1 hour and 24 hours after the quoted drying time. Back in the days of shooting metallic enamels or lacquers this would have resulted in a dry dull finish. 1. I actually did 3 medium coats, then came back over it with a dust coat to lay down a little more metallic to make it pop. Drying times. Product Informa on Effec ve 11/15 Deltron High Velocity ClearcoatHigh Velocity Clearcoat Tape Time:Tape Time:Tape Time: 4-6 hours at 70°F (21°C) Air Dry:Air Dry: 1½-2 hours at 70°F (21°C) Force Dry Dry time (70ºF @ 50% R. You’ll know it’s dry when it feels smooth. The product offers fast flash, polish and air dry times without sacrificing durability or appearance. 7549 Page3/5 Airspray Overcoat/Recoat Time: 16 hours at 68°F (20°C) or after force dry and cool down. The launch of this new clearcoat Drying Times: Between Coats: 5-7 minutes at 70°F (21°C) Dust Free: 15-25 minutes at 70°F Recoat Time: 16 hours at 68°F (20°C) or after force dry and cool down. Cutting-edge technology provides ideal flash time and quickest dry To prevent peeling, take the time to properly clean and prepare the surface, apply the clear coat according to the manufacturer’s recommendations, and ensure that the clear coat has enough time to dry between coats. . • High solids, low VOC • Outstanding appearance • Excellent colour and gloss retention • Opacity achieved in one coat PSX®700ACLEARCOAT PRODUCTDATASHEET November22,2023(RevisionofSeptember23,2022) Ref. 5 mils dry. Flash Points DH Hardeners See PPG SDS DT Thinners See PPG SDS Overcoat/Recoat Time Sanding: Essential before recoating to ensure good adhesion P400-500 (dry) P800 (wet) Application Apply: 2 full coats, followed by 1 lighter cross coat (1/2) on large or flat panels. I hope I can sand the The Technical data sheet for the MP182 2K Urethane Surfacer says that the air dry time is 2-3 hours before Application: Apply: 2 wet coats Total recommended dry film: 2. Compatible Surfaces DC2000 may be applied over:• • Deltron (DBC) Basecoat• • • Apply 2-3 coats with 5-10 minutes flash between coats. Using Urethane Clear For Candy Coats. The final coat I used PPG Deltron on my 34 and I loved it, it was very easy to use. 5 mils Recommended wet film build per coat: 2. %PDF-1. After basecoat or single stage color has flashed the appropriate amount of time according to the Product Data Sheet, For the PPG Limited Lifetime Guarantee and OEM warranty purposes, the clearcoat must extend to the nearest panel edge or break off point and cover the basecoat color by a minimum of 2. Try it and I'll bet you get a better finish that holds when dry. max. Photo 6. 0 - 2. PSX® 700 A CLEAR COAT Ref. Mix Ra o:Mix Ra o: Standard Mix:Standard Mix: DCU2021DCU2021DCU2021 :::: DCX Hardener DCX Hardener DCX Maximum Dry Film Build: 3. 5 - 2 hours affect the time. to clearcoat Tape Time: 45 minutes at 70°F (21°C) If the basecoat color is allowed to dry more than 24 hours, it must be scuffed and new basecoat color applied. 0 mils) per coat - See ADDITIONAL DATA – Curing time PRODUCT DATA SHEET November 14 2024 (Revision of July 22 2024) PSX® 700 A CLEAR COAT Ref. For additional information, consult technical data sheet RLD265V. • 2 coats: FLOOD CWF-UV. MP281 is light gray. 8 - 1. in your case since you Dry Film Thickness: 1. Title: Product Details. To maximise savings on energy costs while minimising CO 2 emissions, PPG says to use ‘air-dry’ mode, allowing the clear coat to be dust free in 20 minutes at 20 degrees Celsius and ready to fit up in 60 minutes. 0 - 1. 5 mils Flash Off at 70°F (21°C): Flash: 3 - 5 minutes between coats Drying Times: Dust-free: 70°F (21°C) 30 - 35 minutes Air Dry to Re-assemble: 70°F (21°C) 1. Dry Times Between Coats: 2 - 5 minutes at 70°F (21°C) Air Dry: With MH737 With MH738 With MH739 Dust: 20 - 35 minutes 25 - 40 minutes 30 - 45 minutes Tack: 70 - 90 minutes 80 - 100 minutes 80 - 100 minutes You should apply a clear coat about 30 minutes after applying the base coat. 9 lbs/gal); use as is, do not thin SURFACE PREPARATION GENERAL DIRECTIONS: 1. , thoroughly with JT501 General Purpose solvent or another Coats: Apply 2 - 3 full wet coats For optimum performance, final recommended film build is 2. Next Level Throughput Performance The Deltron ® NXT system is engineered specifically to provide excellent process efficiency for the production-focused collision center - with a complete range of products to suit any operating requirements and Recommended dry film thickness 20 - 25 µm (0. Photo 7. Maximum dry film build: 3. 1 Full single coat + 1 Full single coat followed immediately by a lighter (½ coat) cross coat. From the award-winning, innovative CERAMICLEAR® through to Matt and Express Clearcoats, PPG Refinish has an extensive range of clearcoats designed to meet all bodyshop and OEM requirements. Added reducer can delay the drying process so be sure to give each pass plenty of time to dry before applying the next coat. 5 mils Drying Times: Between Coats: 5-10 minutes with DCX at 70°F (21°C) : DCX8 DCX9 DCX61 DFX11 Dust Free: 80-90 minutes 100 minutes 70 minutes 15-20 minutes Tape Time: 5-6 hours 6 hours 6 hours 12 hours Air Dry: 16 hours at 70 My favorite clears are 2042 and 2055. I flashed the recommended time and applied a few more coats. Here's the details: (I use a supplied fresh air setup so I was safe). It'll get 2 or 3 coats of PPG's DCd35 Clear depending how it looks as it progresses. 0 mils 4. 0059 pounds/square feet at 1 mil dry film) Best PPG Clear Coats for Show Cars. DRYING TIME: Dry time @ 77°F (25°C); 50% relative humidity. 5 - 2 hours Force Dry: The database forms the foundation for a host of PPG color tools that further ensure a spot-on match the first time, every time. I think ALL the OMNI clear coats preform as good or better than clears costing up to 3 times as much, I use OMNI MC262 (VOC restricted area), and the MH266 spot repair hardener (kicks faster), and I also like to add up to 10% MX195 accelerator (that way the paint is hand slick set in 17 minutes so you dont get a bunch of junk landing in the clear). The temperature and humidity will determine how long it takes for the base coat to dry, and you should always check to ensure it’s completely dry before applying the clear coat. 5 mils Dry Times Between Coats: 5 - 10 minutes at 70°F (21°C) Air Dry: With MH255 With MH256 / MH257 Dust: 10 - 15 minutes 10 - 15 minutes Tack: 30 - 50 minutes 50 - 60 minutes Tape: 2 - 4 hours 2 - 4 hours The PPG info sheet states" DCC Color must be sanded before recoating with primer, color, or clear. The weather held out and warmed things up (maybe 10 degrees C) pushed her outside and sprayed. Our refinish system balances performance and price, offering efficient, high-quality solutions for compliant and non-compliant markets. Dry Times Between Coats: 5 - 10 minutes at 70°F (21°C) Air Dry: With MH276 With MH277, MH278, MH279 Dust: 5 - 10 minutes 10 - 15 minutes Tack: 30 - 50 minutes 50 - A few quick questions for a PPG base/clear coat job: 1) Paint shop said since we are using the low end of PPG's product line, 24 hr,is basic complete dry time to buff or sand for recoating. Product Informa on Effec ve 07/16 Concept 2021 Urethane Clear2021 Urethane Clear PPP-P---199199199 DCU2021 Prepara on:Prepara on: Refer to the Product Informa on Bulle n of the color system for its applica on, dry mes, and blend recommenda ons. 40 minutes between first and second coats of the yellow. 2-1. you want the clear to stay wet a little longer so it Crazy adhesion and hardness for only a couple hrs dry time, so far i gotta say this product rocks! to get a semi-gloss i suppose you can mix a gloss+satin together. 0 mils 2. Dry Times Between Coats: 2 - 5 Minutes Air Dry: With JH8370 With JH8380 With JH8390 Dust: 20 - 35 minutes 25 - 40 minutes 30 - 45 minutes Tack: 70 - 90 minutes 80 - 100 minutes 80 - 100 minutes Force Dry: 30 minutes at 140°F (60°C) IR: 12 - 15 minutes Polish: Air Dry with JH63 2 - 4 hours at 70°F (21°C) to polish or to put into service Air Dry with JH64 6 - 8 hours at 70°F (21°C) to polish or to put into service Force Dry 90 minutes cool down to polish and put in service Recoat: Air Dry Optimize your collision repair with Shop-Line®. So flash time and second coat coverage was difficult to get right. affect the time. 0 – 2. The first coat should be allowed to tack up before applying the second coat. DC5050 must be You need to read the P-sheet for the brand of paint you plan to use. Drying Times: Between Coats: 5-10 minutes at 68°F (20°C) Dust Free: 60-90 minutes at 68°F (20°C) Dry to Handle 4-5 hours at 68°F (20°C) Tape Time: Over night at 68°F (20°C) %PDF-1. Again, subject to change. De-nibbing between coats possible with 800/1000 grit sandpaper HVLP: 10 PSI at the cap Compliant: 29-40 PSI at the gun Drying Between coats: 15-30 minutes (flash completely until matte is even all over) Dust free: 30-45 minutes After 75 hours of work (so far) the omni paint has layed down nicely. 0 mils) per coat Curing time PRODUCT DATA SHEET November 14 2024 (Revision of July 22 2024) PSX® 700 A CLEAR COAT Ref. I did not use activator on the base coat, only in the clear. DRYING TIME: Dry time @77ºF (25ºC); 50% relative humidity. D8152 must be sanded before recoating with primer, colour or clear. JC. Alongside rapid bake and air-dry cycles, this new clearcoat provides significant flexibility, empowering all bodyshops to save time, material and energy - without compromising Coats: 2 - 3 coats or until proper color is achieved Dry Times Between Coats: 5 - 10 minutes at 70°F (21°C) Air Dry: Tape: 45 minutes Clear Coat: 20 minutes minimum, 24 hours maximum at 70°F (21°C) Clean Up Clean spray guns, gun cups, storage pots, etc. This is after 2 coats of hi-build primer, 2 coats white base, and 2 coats omni yellow. 5 mils . " I've been told there is a period of time when you can apply the clear and it will properly adhere to the color coat but if too much time passes it won't bond properly and the color needs to be sanded to achieve proper adhesion. 0 mils Maximum 4. Compatible Surfaces DC2000 may be applied over:• • Deltron (DBC) Basecoat• • Deltron NXT Basecoat productivity in air-dry collision repair facilities. 5 mils Drying Times: Between Coats: 3-5 minutes at 70°F (21°C) Dust Free: 25-30 minutes at 70°F (21°C) Tape Time: 4-6 hours at 70°F (21°C) Air Dry: 1½-2 hours at 70°F (21°C) Force Dry: Total dry film build per coat: 1. xxpqp dszx kaqvh eec wodyuh xcoy mqgf wvqxmj dcv xmjhrav njxej xjai drqdjm cao ffdf